A 20-acre site, presenting endless possibilities.

Infrastructure

Major enabling works include the transformation of Fleming Way bus interchange to ensure optimum connectivity to the town centre. The road will become bus-access only and lowered to the same level as the adjacent public realm. An 850-space multi-storey carpark and 45 sheltered housing units have already been delivered with a brand new NHS building due for completion in May 2017.

Short-term & Long-term vision

In the short-term a diverse and flexible programme of uses would animate the space. Potential concepts include the creation of an outdoor cinema, music performance space, a temporary market for seasonal activities such as an ice rink. With investor interest generated by the success of its temporary uses, the ultimate vision is to create a vibrant and well-connected business district of offices set within an attractive café-culture environment.

DOWNLOADS & LINKS

Planning Application (PDF)

KEY FEATURES

eventual gdv
>£350m

20 acre site

5 min walk to
cardiff-london line